无锡市锡山人民医院新建工程
工程概况:
该项目位于无锡市锡东新城,锡东大道与大成路交界处,工程一期二标段总建筑面积57000m2。其中:地上建筑面积38000m2,地下建筑面积19000m2,建筑总高度为23.85m。项目按三级甲等医院的规模和相关标准规范设置,一期主要为850张床位的门急诊综合楼、科研生活楼及配套辅助用房等,且全部按照与新城相符的绿色低碳理念进行施工。
The project is located at the junction of Xidong New City, Xidong Avenue and Dacheng Road in Wuxi, with a total construction area of 57,000 square meters for the second tender at the first phase of the project, of which the aboveground construction area is 38,000 square meters, underground construction area is 19,000 square meters, and the total building height is 23.85 meters. The project is built to be the size of a Grade III A Hospital as per related standards, and the first phase is mainly an 850-bed emergency building complex, a research and living building, and supporting buildings, all of which are built in accordance with the green and low-carbon philosophy compliant with the New City.